DMJM HARRIS|AECOM
 
MARKETS/SERVICES
  Highways/Bridges
Transit/Rail
    Bus Rapid Transit
      NYC Rapid
      Orange Line
      Silver Line
      TRB
      York Region Rapid
    Commuter Rail
    Freight Rail Projects
    Heavy Rail Projects
    Light Rail Projects
  Airports
  Marine/Goods Transport
  Energy Services
  Power
  Planning
  Prog./Const. Management
  Design-Build
  AECOM Consult

Download the new issue of Legacy, DMJM Harris's bi-annual magazine.

 

Orange Line Northern/Canoga Extension

 

Client: Los Angeles County Metropolitan Transportation Authority

Project location: Los Angeles, California

Project cost: $100 million

 

As a subconsultant, DMJM Harris is providing conceptual and preliminary engineering design for the Northern/Canoga Extension of the Metro Orange Line bus rapid transit (BRT) system. The goal of the project is to environmentally clear and complete preliminary engineering of a five- to six-mile northern extension of the Metro Orange Line busway and an adjacent bikeway.

 

As part of conceptual engineering and further refining the locally preferred alternative, DMJM Harris is evaluating alignment and station variations, preparing the comparative analysis, supporting environmental impact analyses, and providing accurate cost estimating. The project will be designed in accordance with the Authority’s BRT Design Criteria, which also considers potential future conversion to light rail. As part of this project, DMJM Harris will review and make recommendations to improve the BRT design criteria based on the team’s technical expertise and lessons learned from the initial operations of the Orange Line. The design will incorporate any updates to the criteria.

   
 



Printable PagePrint Window  

 
Home  |  Sitemap  |  Contact Us  |  Privacy  |  Terms of Use  |  Disclaimer