DMJM HARRIS|AECOM
 
MARKETS/SERVICES
  Highways/Bridges
Transit/Rail
    Bus Rapid Transit
    Design and Construct
    Heavy Rail Projects
      Program Management Services
      PATH Terminal
      New Starts Projects
      Second Avenue Subway
    Light Rail Projects
  Airports
  Marine/Goods Transport
  Energy Services
  Power
  Planning
  Prog./Const. Management
  Design-Build
  AECOM Consult

Download the new issue of Legacy, DMJM Harris's bi-annual magazine.

 

PATH Permanent World Trade Center Terminal

 

Client: Port Authority of New York and New Jersey

Project location: New York, New York

Project cost: $2.2 billion

 

The Port Authority of New York and New Jersey selected the DMJM Harris-led Downtown Design Partnership, in association with renowned architect Santiago Calatrava, to design the new $2-billion permanent Port Authority Trans-Hudson (PATH) terminal at the World Trade Center (WTC) site in Lower Manhattan. The team is responsible for final engineering of site preparation, site stabilization, and PATH facilities—including tracks, platforms and mezzanine, as well as preliminary through final design for the terminal building, pedestrian connections, security, sustainable design, vertical transportation and conveyances, and public wayfinding systems.

 

The design will incorporate appropriate levels of protection against various threat scenarios and mitigation measures may include blast-protective construction, CCTV systems, physical intrusion protection, and chemical, biological, and radiological security. Further, principles of sustainable design, including energy efficient systems, indoor environmental quality, life-cycle costs and impacts, and material resource and conservation, will be incorporated throughout the facility and considered from construction stage services through building commissioning and use.

   
 



Printable PagePrint Window  

 
Home  |  Sitemap  |  Contact Us  |  Privacy  |  Terms of Use  |  Disclaimer