DMJM HARRIS|AECOM
 
MARKETS/SERVICES
  Highways/Bridges
  Transit/Rail
Airports
    AA Terminal at JFK
    FAA Technical Support
    I-95/Philadelphia Airport
    LaGuardia Airport
    Logan IA - Terminal B
    Pearson Int. Airport
  Marine/Goods Transport
  Energy Services
  Power
  Planning
  Prog./Const. Management
  Design-Build
  AECOM Consult

Download the new issue of Legacy, DMJM Harris's bi-annual magazine.

 

Airport Groundside Development and Roadway Network, Lester B. Pearson International Airport

Client: Greater Toronto Airport Authority

Project location:  Toronto, Canada

Project cost: $270 million

 

DMJM Harris in a joint venture with UMA Engineering Ltd., completed the design for groundside development at the new Lester B. Pearson International Airport in Toronto. The airport redevelopment consists of two major projects: the new terminal facility, and the groundside development, for which DMJM Harris is responsible. The groundside project consists of all access and circulation roads and bridges; the design of the off-site roadways surrounding and accessing the airport; a multipurpose parking garage with 10,000 parking spaces; all site services and utilities; and associated systems and facilities common to an international airport (including site utilities, landscape architecture, security systems, and signage).



Printable PagePrint Window  

 
Home  |  Sitemap  |  Contact Us  |  Privacy  |  Terms of Use  |  Disclaimer