DMJM HARRIS|AECOM
 
MARKETS/SERVICES
  Highways/Bridges
  Transit/Rail
  Airports
Marine/Goods Transport
    JWD Group
    Containers
    Coastal Restoration
    Intermodal Facilities
      Alameda Corridor
      Pier 300
      Oakland Terminal
      Port Ivory
    Oil and Gas Facilities
    Waterfront Development
  Energy Services
  Power
  Planning
  Prog./Const. Management
  Design-Build
  AECOM Consult

Download the new issue of Legacy, DMJM Harris's bi-annual magazine.

 

Alameda Corridor Rail Expressway

Client: Alameda Corridor Transportation Authority (ACTA)

Project location: Southern California, California

Project cost: $2.5 billion

 

DMJM Harris, in joint venture, provided program management, conceptual development, engineering, and construction management services to the Alameda Corridor Transportation Authority, the Port of Los Angeles, and the Port of Long Beach.

 

The joint venture developed conceptual designs, conducted preliminary engineering, conducted highway and railroad capacity studies, evaluated alternative routes and designs, prepared environmental reports, and performed program management services for the development of the Alameda Corridor project since the late 1980s.

 

In preparation for final implementation of the corridor, the joint venture team proposed alternative schedules and staged implementation plans, and developed work-arounds for anticipated opportunities and restraints. In its program management capacity, we were responsible for right-of-way acquisition, utility-relocation coordination, MIS systems, and construction-monitoring services.

   
 



Printable PagePrint Window  

 
Home  |  Sitemap  |  Contact Us  |  Privacy  |  Terms of Use  |  Disclaimer